EUREKA!!!!!
We drilled our well yesterday...and it was a great success. The hole went 117ft with a static water level of 63 ft with a 70 gallon per minute yield. That is right, I said 70 gallons. not only is that enough water to open a water park, the water is so clean. When the well was blasted out, or developed under pressure the gravel discharge had no silt, sand or anything on it...meaning crystal clean.

CAP IT
Here is mike putting a cap on the casing and banding our $250 tag from the state board of ecology.

UDO CHECKING THEIR SET UP

FIRST CASING

THE SUPERVISORS
Andy, the dogs and I hung out all day to watch the entire process. It was so cool to see everything and learn how all this stuff works. Now, we are going to design a gravity feed system to supply the water to the desired areas. I want this sucker to work when the power goes out!