Tuesday, January 22, 2008

pictures of progress


Okay, here are some of the new developments on our little project up here. The ditch. 2920' long, just about 10 football fields in length, its 3'+ wide and 3'+ deep, and its bedded with washed sand. That was a lot of work. Even with all the big equipment we have access to here, I used my John Deere 2210, a shovel and a rake for 75% of the work. The initial hole was dug with the Excavator, an amazing machine and fun to operate, but it doesnt leave a very clean hole...hence the shovel! So, the ditch is done and the 15000 volt cable and 2 transformers are in place. $22,000.00. WOW, the thing I dont get is we did all the work!!!????
So what else is going to go in that big utility ditch? Cable? NOPE! we called about putting in cable, even though there is no service out here and Comcast wanted $43,000.00 to drop their cable in the ground, plus the cable would have to be boosted every 400'. Scratch that. Phone? Nope! Qwest wants us to trench an additional 1000' all the way to 101st ave to tie into the main phone cable. their fee is much smaller, but there is now way we can go another 1000'. so it looks like we will be crossing our fingers for new technology.
Here is what we are thinking:
Dish for the television and internet. We currently use Wild Blue for SAT internet and it is less than stellar. Download is alright, but upload is turtle pace. this is where the rub is. VONAGE has a wireless VOIP phone, but our upload at this moment wont support the phones min. upload speed. So, we will have to rely on cell phones as our primary communications and its not great coverage either. So come on technology! if anyone has any ideas about our communication crunch let me know!
Below are some pics of our progress:


hollie chucking big rocks out of the ditch

andy on the backhoe

15000 volts.

brrrr......its cold

watering hole

end transformer


hadden pitchin' in

back filling the turn to the Remote temp power

voltage artery

we are well on our way.